Latest Updates

GMP01. Contracting for Safety
Updated: Thu, 07/06/2018 - 08:10 , Originally Posted: Tue, 08/03/2016 - 16:23
This generic procedure serves to outline the process of managing contracting safety.
Document Type: Guidance
Sustainable Procurement Tool
Updated: Mon, 28/05/2018 - 07:26 , Originally Posted: Fri, 25/05/2018 - 10:35
This page is currently under construction and you will notified shortly of an official release
Document Type: Safety Manager Tool
SMP08. Risk Reduction
Updated: Mon, 15/01/2018 - 13:42 , Originally Posted: Tue, 08/03/2016 - 14:04
This procedure provides risk reduction guidance for hazards that have not been evaluated as being either tolerable or broadly acceptable and ALARP.
Document Type: Guidance
SMP13. In-Service Safety Management System
Updated: Tue, 21/11/2017 - 15:11 , Originally Posted: Tue, 08/03/2016 - 14:09
This procedure provides guidance for sustaining safety performance by ensuring in-service arrangements are recognised and operated.
Document Type: Guidance
SMP11. Hazard Log
Updated: Tue, 21/11/2017 - 15:02 , Originally Posted: Tue, 08/03/2016 - 14:07
This procedure provides guidance for the continual recording of hazards, accidents and accident sequences, including risk management information, in the Hazard Log.
Document Type: Guidance
SMP10. Safety Requirements and Contracts
Updated: Fri, 03/11/2017 - 14:20 , Originally Posted: Tue, 08/03/2016 - 14:07
This procedure provides guidance for defining the requirements of the Safety Management System (SMS), and how it will be demonstrated that safety targets have been met. The procedure also provides guidance for the development of contractual terms with external contractors where they are required.
Document Type: Guidance
SMP07. Risk and ALARP Evaluation
Updated: Fri, 03/11/2017 - 13:07 , Originally Posted: Tue, 08/03/2016 - 14:02
This procedure provides guidance through Risk and ALARP Evaluation in order to identify where the system Risk meets Tolerability criteria, and where further action is required.
Document Type: Guidance
SMP06. Risk Estimation
Updated: Fri, 03/11/2017 - 12:49 , Originally Posted: Tue, 08/03/2016 - 13:56
This procedure provides guidance through development of the Hazards and Accidents identified previously, to estimate the level of Safety Risk posed by each.
Document Type: Guidance
SMP05. Hazard Identification and Analysis
Updated: Fri, 03/11/2017 - 12:30 , Originally Posted: Tue, 08/03/2016 - 12:27
This procedure provides guidance through the Hazard Identification and Analysis process, in which all credible Hazards are identified and subsequently analysed in order to establish the associated Accidents and Accident Sequences.
Document Type: Guidance
SMP04. Preliminary Hazard Identification and Analysis
Updated: Fri, 03/11/2017 - 12:01 , Originally Posted: Tue, 08/03/2016 - 12:25
This procedure provides guidance for conducting a Preliminary Hazard Identification and Analysis in order to determine the scope of the safety requirements for the system.
Document Type: Guidance

Pages